Frames | No Frames

Return to EDIFACT D95B Code List page.

9011 -

Status event, coded
UN/CEFACT Revision 1995B Code List

Repr:an..3
Desc:Code identifying a status event.
This table also occurs in the following versions of this standard:
D00A, D00B, D01A, D94A, D94B, D95A, D95B, D96A, D96B, D97A, D97B, D98A, D98B, D99A, D99B

1Arrived
The means of transport has arrived at a location.
2Authorized to load
Permission to load has been given by the responsible party.
3Arrived in defective condition
Goods/consignments/equipment have been received or a means of transport has arrived in a defective condition.
4Defective equipment release
Equipment previously the subject of a 'defective condition' status has been returned to service.
5Begun
The process has begun.
6Booked
Goods/consignments/equipment or means of transport have been booked for subsequent movements.
7Booking cancelled
The booking of goods/consignments/equipment or means of transport previously booked has been cancelled.
8Cleared import restrictions
Goods/consignments/equipment held for import restriction purposes have been released for import.
9Cleared export restrictions
Goods/consignments/equipment held prior to loading have now been cleared for export.
10Cleared by agriculture, food or fisheries authorities
Goods/consignments/equipment have been held prior to shipment and are now cleared for shipment following examination by relevant authority.
11Cleared by port authority
The port authority has given permission for the goods/consignments/equipment/means of transport to leave the port.
12Cleared by customs
Customs have cleared goods/consignments for import/export.
13Collected
Goods/consignments/equipment have been collected from a predetermined location.
14Completed
The process has been completed.
15Consolidated
Goods/consignments have been added to other goods/ consignments to form a larger consignment and/or have been incorporated into one or more containers/units.
16Crossed border
Goods/consignments/equipment have crossed a border from one country to another.
17Customs refusal
The Customs authorities have refused to clear the goods/consignments/equipment.
18Damaged
Goods/consignments/equipment have been damaged in the course of transportation.
19Damaged equipment quoted
Damaged equipment has been assessed and the quotation sent to lessor.
20Delayed
Goods/consignments/equipment have been delayed in the course of transportation.
21Delivered
The goods/consignments/equipment have been delivered to a location/party in the transport chain.
22Delivery completed
Delivery of the goods/consignments/equipment has been completed as per instructions.
23Delivery not completed
Delivery of the goods/consignments/equipment has not been completed in accordance with instructions.
24Departed
The means of transport has departed from a location in the transport chain.
25Departure delay
The transport has been delayed in departing on the arranged transport action.
26Deramped
Equipment has been removed from a position above other equipment on a means of transport.
27Despatched
The goods/consignments/equipment have departed from a location in the transport chain.
28Stripped
The goods/consignments/equipment have been unloaded from equipment in which they were transported.
29Discharged
The goods/consignments/equipment have been unloaded from a means of transport.
30Empty on inspection
The package/equipment has been found to be empty.
31En route
The goods/consignments/equipment are in the normal course of transportation to the next destination.
32Equipment in from repair
A piece of equipment has been received in after having been sent out for repair.
33Equipment out for repair
A piece of equipment has been sent out for repair.
34Equipment repaired
A damaged piece of equipment has been repaired.
35Expedited to destination
The goods/consignments/equipment have been expedited to the next/final destination in the transport chain.
36Not found
The goods/consignments/equipment notified to be missing have not been located.
37Found
The goods/consignments/equipment previously notified missing have now been located.
38Freight paid
The freight charges on goods/consignments/equipment have been paid.
39From bond
The goods/consignments/equipment have been moved/are available to be moved from bond.
40Goods/consignments/equipment at port
The goods/consignments/equipment have arrived/are available at port.
41Handover
The goods/consignments/equipment have been formally passed from one point in the transport chain to another under responsibility of the same transporter. (See also 'handover delivered'.)
42Handover delivered
The goods/consignments/equipment from one transport operator have been passed to another transport operator. (see also 'handover'.)
43Handover received
The goods/consignments/equipment have been received by one transport operator from another transport operator.
44Ill-routed consignment reforwarded
The goods/consignments/equipment which were previously sent to a wrong destination are on the way to correct destination.
45Informed Consignee of arrival
The consignee has been informed formally of the arrival at a transit or final destination of goods/consignments/equipment.
46Into bond
The goods/consignments/equipment have been moved/is available to be moved into bond.
47Into packing depot
The goods/consignments/equipment have been moved into a LCL (less than container load)/packing depot.
48Loaded
The goods/consignments/equipment have been loaded onto a means of transport.
49Lost
The goods/consignments/equipment have been lost in the course of a movement along the transport chain.
50Manifested
The goods/consignments/equipment have been included on the list of units moving from one location to another in the transport chain.
51Means of transport damaged
The means of transport on which the goods/consignments/equipment was being (was to be) moved has been damaged.
52Mechanical breakdown
There has been a mechanical breakdown of the means of transport/equipment on which the goods/consignments/equipment was being (was to be) moved.
53No pick-up
The goods/consignments/equipment expected to be picked up and conveyed from location to location in the transport chain have not been picked up.
54Not identified
The goods/consignments/equipment expected to be located and identified in the transport chain cannot be identified.
55Not collected
The goods/consignments/equipment expected to be collected after transportation have not been collected.
56Not delivered
The goods/consignments/equipment have not been delivered.
57Not loaded
The goods/consignments/equipment to be loaded onto a means of transport have not been loaded on the expected transport.
58Off hire
Equipment previously under hire to a customer has been returned to the lessor and the contract has been terminated.
59Off loaded
The goods/consignments/equipment previously loaded to a means of transport have been removed from that means of transport before completion of the planned transport.
60On hire
Equipment has been hired out to a hirer/customer.
61Outstanding claims settled
Outstanding claims in respect of goods/consignments/equipment have been settled.
62Over landed
Goods/consignments/equipment have been discharged from a means of transport at a specific location when they were not expected to be discharged.
63Package not ready
The package was not available for collection.
64Pick-up awaited
Goods/consignments/equipment are awaiting pick-up.
65Plugged equipment
Equipment, e.g. a refrigerated container, has been plugged into the power source.
66Plundered
The goods/consignments/equipment have been plundered.
67Positioned goods/consignments/equipment
Goods/consignments/equipment have been positioned on a means of transport.
68Pre-informed
The consignor/consignee has been advised in advance of a transport action.
69Put to refuse
The goods/consignments/equipment have been written off and disposed of.
70Ramped equipment
Equipment has been placed above other equipment and placed on a means of transport.
71Ready for transportation
Goods/consignments/equipment have been made ready for transportation.
72Receipt fully acknowledged
The consignee has given full acknowledgement for the receipt of goods.
73Receipt partially acknowledged
The consignee has not given full acknowledgement for the receipt of goods.
74Received
Goods/consignments/equipment have been received at a location/party in the transport chain.
75Reconsigned
Goods/consignments/equipment have been consigned to a party other than the original or subsequent consignees.
76Reforwarding on request
The goods/consignments/equipment which have been delayed will be/have been reforwarded on request by appropriate authority.
77Refused without reason given
The transport action/documentation has been refused without explanation.
78Released
Goods/consignments/equipment have been released to an authorized party.
79Reloaded
Goods/consignments/equipment have been reloaded onto a means of transport.
80Returned as instructed
The goods/consignments/equipment have been returned to a location as per instructions.
81Returned as wreck
The goods/consignments/equipment have been returned in a wrecked condition to a location as per instructions.
82Returned
Goods/consignments/equipment have been returned to a previous location.
83Sealed equipment
The equipment has been sealed according to operational and governmental requirements.
84Service ordered
A service has been ordered in relation to the transportation of goods/consignments/equipment.
85Short landed
Goods/consignments/equipment expected to be discharged from a means of transport at a specific location have not been discharged.
86Short shipped
The goods/consignments/equipment expected to be sent to a specific destination on a selected means of transport from a specific location have not been loaded for onward delivery.
87Sorted wrong route
The goods/consignments/equipment have been sorted erroneously to an incorrect route.
88Split
The consignment of goods has been split into two or more consignments.
89Steam cleaned
The equipment, e.g. a container, has been steam cleaned.
90Stopped
The goods/consignments/equipment have been stopped from further movement in the transport chain.
91Stored
The goods/consignments/equipment have been stored at a location.
92Stowed
The goods/consignments/equipment have been stowed for transportation in the selected equipment/means of transport.
93Stuffed
The goods/consignments/equipment have been loaded into a piece of equipment, e.g. a container.
94Stuffed and sealed
The goods/consignments/equipment have been loaded into a piece of equipment and the equipment has been sealed.
95Sub-lease in
In the leasing of equipment a sub-lease has been notified to the lessor.
96Sub-lease out
In the leasing of equipment a sub-lease has been notified by a lessee.
97Surveyed damage
Damaged goods/consignments/equipment have been officially surveyed by a third party to assess the extent of damage.
98Transferred in
The goods/consignments/equipment have been transferred in from another location.
99Transferred out
The goods/consignments/equipment have been transferred out to another location.
100Transhipment
The goods/consignments/equipment have been transhipped to another means of transport.
101Transit delay
The goods/consignments/equipment has been delayed in transit.
102Unknown goods/consignments/equipment
The goods/consignments/equipment are not known to the source being enquired upon.
103Unplugged equipment
Equipment, e.g. a refrigerated container, has been unplugged from the power source at a given location.

Change indicators
plus sign An addition.
asterisk Addition/substraction/change to a code entry for a particular data element.
hash or pound sign Changes to names.
vertical bar Changes to text for descriptions, notes and functions.
minus sign A deletion.
letter X Marked for deletion.

Return to EDIFACT D95B Code List page.