9011 -

Status event, coded
UN/CEFACT Revision 1994A Code List

Repr:an..3
Desc:Code identifying a status event.
Note:User or association defined code. May be used in combination with 1131/3055.
This table also occurs in the following versions of this standard:
D00A, D00B, D01A, D94A, D94B, D95A, D95B, D96A, D96B, D97A, D97B, D98A, D98B, D99A, D99B

1
Arrived
The means of transport has arrived at a location.
2
Authorized to load
Permission to load has been given by the responsible party.
3
Arrived in defective condition
Goods/consignments/equipment have been received or a means of transport has arrived in a defective condition.
4
Defective equipment release
Equipment previously the subject of a 'defective condition' status has been returned to service.
5
Begun
The process has begun.
6
Booked
Goods/consignments/equipment or means of transport have been booked for subsequent movements.
7
Booking cancelled
The booking of goods/consignments/equipment or means of transport previously booked has been cancelled.
8
Cleared import restrictions
Goods/consignments/equipment held for import restriction purposes have been released for import.
9
Cleared export restrictions
Goods/consignments/equipment held prior to loading have now been cleared for export.
10
Cleared by agriculture, food or fisheries authorities
Goods/consignments/equipment have been held prior to shipment and are now cleared for shipment following examination by relevant authority.
11
Cleared by port authority
The port authority has given permission for the goods/consignments/equipment/means of transport to leave the port.
12
Cleared by customs
Customs have cleared goods/consignments for import/export.
13
Collected
Goods/consignments/equipment have been collected from a predetermined location.
14
Completed
The process has been completed.
15
Consolidated
Goods/consignments have been added to other goods/ consignments to form a larger consignment and/or have been incorporated into one or more containers/units.
16
Crossed border
Goods/consignments/equipment have crossed a border from one country to another.
17
Customs refusal
The Customs authorities have refused to clear the goods/consignments/equipment.
18
Damaged
Goods/consignments/equipment have been damaged in the course of transportation.
19
Damaged equipment quoted
Damaged equipment has been assessed and the quotation sent to lessor.
20
Delayed
Goods/consignments/equipment have been delayed in the course of transportation.
21
Delivered
The goods/consignments/equipment have been delivered to a location/party in the transport chain.
22
Delivery completed
Delivery of the goods/consignments/equipment has been completed as per instructions.
23
Delivery not completed
Delivery of the goods/consignments/equipment has not been completed in accordance with instructions.
24
Departed
The means of transport has departed from a location in the transport chain.
25
Departure delay
The transport has been delayed in departing on the arranged transport action.
26
Deramped
Equipment has been removed from a position above other equipment on a means of transport.
27
Despatched
The goods/consignments/equipment have departed from a location in the transport chain.
28
Stripped
The goods/consignments/equipment have been unloaded from equipment in which they were transported.
29
Discharged
The goods/consignments/equipment have been unloaded from a means of transport.
30
Empty on inspection
The package/equipment has been found to be empty.
31
En route
The goods/consignments/equipment are in the normal course of transportation to the next destination.
32
Equipment in from repair
A piece of equipment has been received in after having been sent out for repair.
33
Equipment out for repair
A piece of equipment has been sent out for repair.
34
Equipment repaired
A damaged piece of equipment has been repaired.
35
Expedited to destination
The goods/consignments/equipment have been expedited to the next/final destination in the transport chain.
36
Not found
The goods/consignments/equipment notified to be missing have not been located.
37
Found
The goods/consignments/equipment previously notified missing have now been located.
38
Freight paid
The freight charges on goods/consignments/equipment have been paid.
39
From bond
The goods/consignments/equipment have been moved/are available to be moved from bond.
40
Goods/consignments/equipment at port
The goods/consignments/equipment have arrived/are available at port.
41
Handover
The goods/consignments/equipment have been formally passed from one point in the transport chain to another under responsibility of the same transporter. (See also 'handover delivered'.)
42
Handover delivered
The goods/consignments/equipment from one transport operator have been passed to another transport operator. (see also 'handover'.)
43
Handover received
The goods/consignments/equipment have been received by one transport operator from another transport operator.
44
Ill-routed consignment reforwarded
The goods/consignments/equipment which were previously sent to a wrong destination are on the way to correct destination.
45
Informed Consignee of arrival
The consignee has been informed formally of the arrival at a transit or final destination of goods/consignments/ equipment.
46
Into bond
The goods/consignments/equipment have been moved/is available to be moved into bond.
47
Into packing depot
The goods/consignments/equipment have been moved into a LCL (less than container load)/packing depot.
48
Loaded
The goods/consignments/equipment have been loaded onto a means of transport.
49
Lost
The goods/consignments/equipment have been lost in the course of a movement along the transport chain.
50
Manifested
The goods/consignments/equipment have been included on the list of units moving from one location to another in the transport chain.
51
Means of transport damaged
The means of transport on which the goods/consignments/ equipment was being (was to be) moved has been damaged.
52
Mechanical breakdown
There has been a mechanical breakdown of the means of transport/equipment on which the goods/consignments/ equipment was being (was to be) moved.
53
No pick-up
The goods/consignments/equipment expected to be picked up and conveyed from location to location in the transport chain have not been picked up.
54
Not identified
The goods/consignments/equipment expected to be located and identified in the transport chain cannot be identified.
55
Not collected
The goods/consignments/equipment expected to be collected after transportation have not been collected.
56
Not delivered
The goods/consignments/equipment have not been delivered.
57
Not loaded
The goods/consignments/equipment to be loaded onto a means of transport have not been loaded on the expected transport.
58
Off hire
Equipment previously under hire to a customer has been returned to the lessor and the contract has been terminated.
59
Off loaded
The goods/consignments/equipment previously loaded to a means of transport have been removed from that means of transport before completion of the planned transport.
60
On hire
Equipment has been hired out to a hirer/customer.
61
Outstanding claims settled
Outstanding claims in respect of goods/consignments/ equipment have been settled.
62
Over landed
Goods/consignments/equipment have been discharged from a means of transport at a specific location when they were not expected to be discharged.
63
Package not ready
The package was not available for collection.
64
Pick-up awaited
Goods/consignments/equipment are awaiting pick-up.
65
Plugged equipment
Equipment, e.g. a refrigerated container, has been plugged into the power source.
66
Plundered
The goods/consignments/equipment have been plundered.
67
Positioned goods/consignments/equipment
Goods/consignments/equipment have been positioned on a means of transport.
68
Pre-informed
The consignor/consignee has been advised in advance of a transport action.
69
Put to refuse
The goods/consignments/equipment have been written off and disposed of.
70
Ramped equipment
Equipment has been placed above other equipment and placed on a means of transport.
71
Ready for transportation
Goods/consignments/equipment have been made ready for transportation.
72
Receipt fully acknowledged
The consignee has given full acknowledgement for the receipt of goods.
73
Receipt partially acknowledged
The consignee has not given full acknowledgement for the receipt of goods.
74
Received
Goods/consignments/equipment have been received at a location/party in the transport chain.
75
Reconsigned
Goods/consignments/equipment have been consigned to a party other than the original or subsequent consignees.
76
Reforwarding on request
The goods/consignments/equipment which have been delayed will be/have been reforwarded on request by appropriate authority.
77
Refused without reason given
The transport action/documentation has been refused without explanation.
78
Released
Goods/consignments/equipment have been released to an authorized party.
79
Reloaded
Goods/consignments/equipment have been reloaded onto a means of transport.
80
Returned as instructed
The goods/consignments/equipment have been returned to a location as per instructions.
81
Returned as wreck
The goods/consignments/equipment have been returned in a wrecked condition to a location as per instructions.
82
Returned
Goods/consignments/equipment have been returned to a previous location.
83
Sealed equipment
The equipment has been sealed according to operational and governmental requirements.
84
Service ordered
A service has been ordered in relation to the transportation of goods/consignments/equipment.
85
Short landed
Goods/consignments/equipment expected to be discharged from a means of transport at a specific location have not been discharged.
86
Short shipped
The goods/consignments/equipment expected to be sent to a specific destination on a selected means of transport from a specific location have not been loaded for onward delivery.
87
Sorted wrong route
The goods/consignments/equipment have been sorted erroneously to an incorrect route.
88
Split
The consignment of goods has been split into two or more consignments.
89
Steam cleaned
The equipment, e.g. a container, has been steam cleaned.
90
Stopped
The goods/consignments/equipment have been stopped from further movement in the transport chain.
91
Stored
The goods/consignments/equipment have been stored at a location.
92
Stowed
The goods/consignments/equipment have been stowed for transportation in the selected equipment/means of transport.
93
Stuffed
The goods/consignments/equipment have been loaded into a piece of equipment, e.g. a container.
94
Stuffed and sealed
The goods/consignments/equipment have been loaded into a piece of equipment and the equipment has been sealed.
95
Sub-lease in
In the leasing of equipment a sub-lease has been notified to the lessor.
96
Sub-lease out
In the leasing of equipment a sub-lease has been notified by a lessee.
97
Surveyed damage
Damaged goods/consignments/equipment have been officially surveyed by a third party to assess the extent of damage.
98
Transferred in
The goods/consignments/equipment have been transferred in from another location.
99
Transferred out
The goods/consignments/equipment have been transferred out to another location.
100
Transhipment
The goods/consignments/equipment have been transhipped to another means of transport.
101
Transit delay
The goods/consignments/equipment has been delayed in transit.
102
Unknown goods/consignments/equipment
The goods/consignments/equipment are not known to the source being enquired upon.
103
Unplugged equipment
Equipment, e.g. a refrigerated container, has been unplugged from the power source at a given location.

Change indicators
plus sign An addition.
asterisk Addition/substraction/change to a code entry for a particular data element.
hash or pound sign Changes to names.
vertical bar Changes to text for descriptions, notes and functions.
minus sign A deletion.
letter X Marked for deletion.

Return to EDIFACT D94A Code List page.