| 2 | Delivery date/time, requested | 
|  | Date on which buyer requests goods to be delivered. | 
| 3 | Invoice date/time | 
|  | [2376]  Date when a Commercial Invoice is issued. | 
| 4 | Order date/time | 
|  | [2010]  Date when an order is issued. | 
| 7 | Effective date/time | 
|  | Date and/or time at which specified event or document becomes effective. | 
| 8 | Order received date/time | 
|  | Date/time when the purchase order is received by the seller. | 
| 9 | Processing date/time | 
|  | Date/time of processing. | 
| 10 | Shipment date/time, requested | 
|  | Date on which goods should be shipped or despatched by the supplier. | 
| 11 | Despatch date/time | 
|  | (2170) Date/time on which the goods are/should be despatched/shipped. | 
| 12 | Terms discount due date/time | 
|  | Date by which payment should be made if discount terms are to apply. | 
| 13 | Terms net due date | 
|  | Date by which payment must be made. | 
| 14 | Payment date/time, deferred | 
|  | date/time when installments are due. | 
| 15 | Promotion start date/time | 
|  | Date/time when promotion activities begin. | 
| 16 | Promotion end date/time | 
|  | Date/time when promotion activities end. | 
| 17 | Delivery date/time, estimated | 
|  | Date and/or time when the shipper of the goods expects delivery will take place. | 
| 18 | Installation date/time/period | 
|  | Self explanatory. | 
| 20 | Cheque date/time | 
|  | Date/time when cheque is issued. | 
| 21 | Charge back date/time | 
|  | Description to be provided. | 
| 22 | Freight bill date/time | 
|  | Date/time when freight bill is issued. | 
| 35 | Delivery date/time, actual | 
|  | Date/time on which goods or consignment are delivered at their destination. | 
| 36 | Expiry date | 
|  | Date of expiry of the validity of a referenced document, price information or any other referenced data element with a limited validity period. | 
| 37 | Ship not before date/time | 
|  | Goods should not be shipped before given date/time. | 
| 38 | Ship not later than date/time | 
|  | Date/time by which the goods should have been shipped. | 
| 39 | Ship week of date | 
|  | Date identifying the week during which goods should be shipped. | 
| 42 | Superseded date/time | 
|  | Date/time being overlaid by a date given elsewhere. | 
| 44 | Availability | 
|  | Date/time when received item is available. | 
| 50 | Goods receipt date/time | 
|  | Date/time upon which the goods were received by a given party. | 
| 51 | Cumulative quantity start date | 
|  | First Date for accumulation of delivery quantities. | 
| 52 | Cumulative quantity end date | 
|  | Last Date for accumulation of delivery quantities. | 
| 53 | Buyer's local time | 
|  | Time at the buyers location. | 
| 54 | Seller's local time | 
|  | Time at the sellers location. | 
| 55 | Confirmed date/time | 
|  | Date/time which has been confirmed. | 
| 58 | Clearance date (Customs) | 
|  | (3080) Date on which Customs formalities necessary to allow goods to be exported, to enter home use, or to be placed under another Customs procedure has been accomplished (CCC). | 
| 59 | Inland ship date | 
|  | Date on which Customs authorized the movement of an in bond shipment. | 
| 60 | Engineering change level date | 
|  | Date the engineering level of goods is changed. | 
| 61 | Cancel if not delivered by this date | 
|  | Self explanatory. | 
| 63 | Delivery date/time, latest | 
|  | Date identifying a point of time after which goods should not or will not be delivered. | 
| 64 | Delivery date/time, earliest | 
|  | Date identifying a point in time before which the goods should not be delivered. | 
| 65 | Delivery date/time, 1st schedule | 
|  | Self explanatory. | 
| 67 | Delivery date/time, current schedule | 
|  | Delivery Date deriving from actual schedule. | 
| 69 | Delivery date/time, promised for | 
|  | [2138]  Date by which, or period within which, the merchandise should be delivered to the buyer, as agreed between the seller and the buyer (generic term). | 
| 71 | Delivery date/time, requested for (after and including) | 
|  | Delivery should happen earliest at given date. | 
| 72 | Delivery date/time, promised for (after and including) | 
|  | Delivery might take place earliest at given date. | 
| 74 | Delivery date/time, requested for (prior to and including) | 
|  | Delivery should take place latest at given date. | 
| 75 | Delivery date/time, promised for (prior to and including) | 
|  | Delivery might take place latest at given date. | 
| 76 | Delivery date/time, scheduled for | 
|  | Self explanatory. | 
| 79 | Shipment date/time, promised for | 
|  | Shipment might happen at given date/time. | 
| 81 | Shipment date/time, requested for (after and including) | 
|  | Shipment should happen earliest at given date. | 
| 84 | Shipment date/time, requested for (prior to and including) | 
|  | Shipment should take place latest at given date. | 
| 85 | Shipment date/time, promised for (prior to and including) | 
|  | Shipment might take place latest at given date. | 
| 89 | Inquiry date | 
|  | Self explanatory. | 
| 90 | Report start date | 
|  | Self explanatory. | 
| 91 | Report end date | 
|  | Self explanatory. | 
| 92 | Contract effective date | 
|  | Date when a contract becomes valid. | 
| 93 | Contract expiry date | 
|  | Date when a contract expires. | 
| 94 | Production/manufacture date | 
|  | Date on which goods are produced. | 
| 95 | Bill of lading date | 
|  | Date as specified on the bill of lading. | 
| 96 | Discharge date/time | 
|  | Date/time when goods should, might or have been discharged from the means of transport. | 
| 97 | Transaction creation date | 
|  | Self explanatory. | 
| 101 | Production date, no schedule established as of | 
|  | Date as of there is no valid production schedule. | 
| 107 | Deposit date/time | 
|  | Self explanatory. | 
| 108 | Postmark date/time | 
|  | Self explanatory. | 
| 109 | Receive at lockbox date | 
|  | Self explanatory. | 
| 110 | Ship date, originally scheduled | 
|  | Self explanatory. | 
| 111 | Manifest/ship notice date | 
|  | Self explanatory. | 
| 113 | Sample required date | 
|  | Date as of a sample has to be available customer defined. | 
| 114 | Tooling required date | 
|  | Date as of a tool has to be available customer defined. | 
| 115 | Sample available date | 
|  | Date as of a sample will be available seller defined. | 
| 117 | Delivery date/time, first | 
|  | First possible date/time for delivery. | 
| 119 | Test performed date | 
|  | Date when a test has been completed. | 
| 123 | Documentary credit expiry date/time | 
|  | The latest date/time for presentation of the documents to the bank where the credit expires. | 
| 124 | Despatch note date | 
|  | [2218]  Date when a Despatch Note is issued. | 
| 125 | Import licence date | 
|  | [2292]  Date when Import Licence is issued. | 
| 126 | Contract date | 
|  | [2326]  Date when a Contract is agreed. | 
| 128 | Delivery date/time, last | 
|  | Date when delivery should be or has been accomplished. | 
| 129 | Exportation date | 
|  | Date when imported vessel/merchandise last left the country of export for the country of import. | 
| 131 | Tax point date | 
|  | Date on which tax is due or calculated. | 
| 132 | Arrival date/time, estimated | 
|  | (2348) Date/time when carrier estimates that a means of transport should arrive at the port of discharge or place of destination. | 
| 133 | Departure date/time, estimated | 
|  | Date/time when carrier estimates that a means of transport should depart at the place of departure. | 
| 134 | Rate of exchange date/time | 
|  | Date/time on which the exchange rate was fixed. | 
| 135 | Telex date | 
|  | Date identifying when a telex message was sent. | 
| 136 | Departure date/time | 
|  | [2280]  Date (and time) of departure of means of transport. | 
| 137 | Document/message date/time | 
|  | (2006) Date/time when a document/message is issued. This may include authentication. | 
| 138 | Payment date | 
|  | [2034]  Date on which an amount due is made available to the creditor, in accordance with the terms of payment. | 
| 140 | Payment due date | 
|  | [2480]  Date when an amount due should be made available to the creditor, in accordance with the terms of payment. | 
| 141 | Presentation date of Goods declaration (Customs) | 
|  | [2032]  Date on which a Goods declaration is presented or lodged with Customs. | 
| 143 | Acceptance date/time of goods | 
|  | [2126]  Date on which the goods are taken over by the carrier at the place of acceptance (CMR 4). | 
| 144 | Quota date | 
|  | Description to be provided. | 
| 146 | Entry date, estimated (Customs) | 
|  | Date on which the official date of Customs entry is anticipated. | 
| 147 | Expiry date of export licence | 
|  | [2078]  Date of expiry of the validity of an Export Licence. | 
| 148 | Acceptance date of Goods declaration (Customs) | 
|  | [2036]  Date on which a Goods declaration is accepted by Customs in accordance with Customs legislation. | 
| 149 | Invoice date, required | 
|  | Date required for invoice issue. | 
| 150 | Declaration/presentation date | 
|  | Date when item has been or has to be declared/presented. | 
| 151 | Importation date | 
|  | Date on which goods are imported, as determined by the governing Customs administration. | 
| 152 | Exportation date for textiles | 
|  | Date when imported textiles last left the country of origin for the country of importation. | 
| 153 | Cancellation date/time, latest | 
|  | The latest date/time on which cancellation of the payment order may be requested. | 
| 154 | Acceptance date of document | 
|  | Self explanatory. | 
| 155 | Accounting period start date | 
|  | Self explanatory. | 
| 156 | Accounting period end date | 
|  | Self explanatory. | 
| 157 | Validity start date | 
|  | Self explanatory. | 
| 158 | Horizon start date | 
|  | The first date of a period forming a horizon. | 
| 159 | Horizon end date | 
|  | The last date of a period forming a horizon. | 
| 160 | Authorization date | 
|  | Date when an authorization was given. | 
| 161 | Release date of customer | 
|  | Date the customer authorised the goods' release. | 
| 162 | Release date of supplier | 
|  | Date when the supplier released goods. | 
| 163 | Processing start date/time | 
|  | Date/Time when a specific process starts. | 
| 164 | Processing end date/time | 
|  | Date/Time when a specific process ends. | 
| 165 | Tax period start date | 
|  | Date when a tax period begins. | 
| 166 | Tax period end date | 
|  | Date when a tax period ends. | 
| 167 | Charge period start date | 
|  | The charge period's first date. | 
| 168 | Charge period end date | 
|  | The charge period's last date. | 
| 169 | Lead time | 
|  | Time required between order entry till earliest goods delivery. | 
| 170 | Settlement due date | 
|  | More generic than 'payment due date' and therefore more apt for reinsurance/insurance business. | 
| 171 | Reference date/time | 
|  | Date/time on which the reference was issued. | 
| 172 | Hired from date | 
|  | Date from which an item has been or will be hired. | 
| 173 | Hired until date | 
|  | Date until which an item has been or will be hired. | 
| 174 | Advise after date/time | 
|  | The information must be advised after the date/time indicated. | 
| 175 | Advise before date/time | 
|  | The information must be advised before the date/time indicated. | 
| 176 | Advise completed date/time | 
|  | The advise has been completed at the date indicated. | 
| 177 | Advise on date/time | 
|  | The information must be advised on the date/time indicated. | 
| 178 | Arrival date/time, actual | 
|  | [2106]  Date (and time) of arrival of means of transport. | 
| 179 | Booking date/time | 
|  | Date at which the booking was made. | 
| 180 | Closing date/time | 
|  | Final date for delivering cargo to a liner ship. | 
| 181 | Positioning date/time of equipment | 
|  | Date/time when equipment is positioned. | 
| 182 | Issue date | 
|  | Date when a document/message has been or will be issued. | 
| 183 | Date, as at | 
|  | Date related to a given context. | 
| 184 | Notification date/time | 
|  | Date/time of notification. | 
| 185 | Commenced tank cleaning date/time | 
|  | The date/and or time tank cleaning was started. | 
| 186 | Departure date/time, actual | 
|  | (2280) Date (and time) of departure of means of transport. | 
| 187 | Authentication date/time of document | 
|  | Date/time when the document is signed or otherwise authenticated. | 
| 188 | Previous current account date | 
|  | Self explanatory. | 
| 189 | Departure date/time, scheduled | 
|  | Date (and time) of scheduled departure of means of transport. | 
| 190 | Transshipment date/time | 
|  | Date and time of the transfer of the goods from one means of transport to another. | 
| 191 | Delivery date/time, expected | 
|  | Date/time on which goods are expected to be delivered. | 
| 192 | Expiration date/time of customs document | 
|  | Date on which validity of a customs document expires. | 
| 193 | Execution date | 
|  | The date when ordered bank initiated the transaction. | 
| 194 | Start date/time | 
|  | Date/time on which a period starts. | 
| 195 | Expiry date of import licence | 
|  | [2272]  Date of expiry of the validity of an Import Licence. | 
| 196 | Departure date/time, earliest | 
|  | Date/time of earliest departure of means of transport. | 
| 197 | Laytime first day | 
|  | First of a number of days allowed in a charter party of the loading and discharging of cargo. | 
| 198 | Laytime last day | 
|  | Last of a number of days allowed in a charter party for the loading and discharging of cargo. | 
| 199 | Positioning date/time of goods | 
|  | The date and/or time the goods have to be or have been positioned. | 
| 200 | Pick-up/collection date/time of cargo | 
|  | Date/time at which the cargo is picked up. | 
| 201 | Pick-up date/time of equipment | 
|  | Date/time at which the equipment is picked up. | 
| 202 | Posting date | 
|  | The date when an entry is posted to an account. | 
| 203 | Execution date/time, requested | 
|  | The date/time on which the ordered bank is requested to initiate the payment order, as specified by the originator (e.g. the date of the debit). | 
| 204 | Release date (Customs) | 
|  | Date on which Customs releases merchandise to the carrier or importer. | 
| 205 | Settlement date | 
|  | Date for settlement of financial transaction e.g. foreign exchange securities. | 
| 206 | End date/time | 
|  | Date/time on which a period (from - to) ends. | 
| 207 | Commenced pumping ballast date/time | 
|  | Date/time on which the intake of materials to be carried to improve the trim and the stability of the means of transport, was commenced. | 
| 208 | Departure date/time, ultimate | 
|  | Date/time at which a means of transport has to depart ultimately. | 
| 209 | Value date | 
|  | Date on which the funds are at the disposal of the beneficiary or cease to be at the disposal of the ordering customer. | 
| 210 | Reinsurance current account period | 
|  | Description to be provided. | 
| 211 | 360/30 | 
|  | Calculation is based on year of 360 days, month of 30 days. | 
| 212 | 360/28-31 | 
|  | Calculation is based on year of 360 days, month of 28-31 days. | 
| 213 | 365-6/30 | 
|  | Calculation is based on year of 365-6 days, month of 30 days. | 
| 214 | 365-6/28-31 | 
|  | Calculation is based on year of 365-6 days, month of 28-31 days. | 
| 215 | 365/28-31 | 
|  | Calculation is based on year of 365 days, month of 28-31 days. | 
| 216 | 365/30 | 
|  | Calculation is based on year of 365 days, month of 30 days. | 
| 218 | Authentication/validation date/time | 
|  | Self explanatory. | 
| 219 | Crossborder date/time | 
|  | Date/time at which goods are transferred across a country border. | 
| 221 | Interest period | 
|  | Number of days used for the calculation of interests. | 
| 222 | Presentation date, latest | 
|  | Latest date for presentation of a document. | 
| 223 | Delivery date/time, deferred | 
|  | New date and time of delivery calculated on basis of a consignee's requirement (chargeable). | 
| 224 | Permit to admit date | 
|  | Date on which permission was granted to move merchandise into a bonded warehouse or free trade zone. | 
| 225 | Certification of weight date/time | 
|  | Date/time at which the carrier proceeds to the weighting of the goods. | 
| 226 | Discrepancy date/time | 
|  | Date/time at which a discrepancy has been found. | 
| 227 | Beneficiary's banks due date | 
|  | Date on which funds should be made available to the beneficiary's bank. | 
| 228 | Debit value date, requested | 
|  | Date on which the account owner wants the debit value to his account. | 
| 229 | Hoses connected date/time | 
|  | The date and/or time hoses were connected. | 
| 230 | Hoses disconnected date/time | 
|  | The date and/or time hoses were disconnected. | 
| 231 | Arrival date/time, earliest | 
|  | Date/time of earliest arrival of means of transport. | 
| 232 | Arrival date/time, scheduled | 
|  | Date (and time) of scheduled arrival of means of transport. | 
| 233 | Arrival date/time, ultimate | 
|  | Date (and time) of ultimate arrival of means of transport. | 
| 234 | Collection date/time, earliest | 
|  | The transport order may be issued before the goods are ready for picking up. This date/time indicates from when on the carrier can have access to the consignment. | 
| 235 | Collection date/time, latest | 
|  | In relation with the arrangements agreed between buyer and seller or between sender and main transport it may be necessary to specify the latest collection date/time. | 
| 236 | Completed pumping ballast date/time | 
|  | Date/time at which the intake of materials, to be carried to improve the trim and the stability of the means of transport, was completed. | 
| 237 | Completed tank cleaning date/time | 
|  | The date and/or time tank cleaning was completed. | 
| 238 | Tanks accepted date/time | 
|  | The date and/or time the tanks are to be or have been accepted. | 
| 239 | Tanks inspected date/time | 
|  | The date and/or time the tanks are to be or have been inspected. | 
| 240 | Reinsurance accounting period | 
|  | To identify a reinsurance account period via start and end dates. Note: This period is not the same as "reinsurance current account period". | 
| 242 | Preparation date/time of document | 
|  | Self explanatory. | 
| 243 | Transmission date/time of document | 
|  | Self explanatory. | 
| 244 | Settlement date, planned | 
|  | Self explanatory. | 
| 245 | Underwriting year | 
|  | Year in which the treaty was commenced. | 
| 246 | Accounting year | 
|  | Year considered for accounting of the treaty or portion of the treaty. | 
| 247 | Year of occurrence | 
|  | Year in which a specific event (e.g. a loss) took place. | 
| 248 | Loss date | 
|  | Date on which a referenced (major) loss occurred. | 
| 249 | Cash call date | 
|  | Date on which a cash call was made for a loss suffered and covered. | 
| 250 | Re-exportation date | 
|  | Re-export in case of temporary admission. | 
| 251 | Re-importation date | 
|  | Re-import in case of temporary admission. | 
| 252 | Arrival date/time at initial port | 
|  | Date/time that the conveyance arrives at the initial port in the country of destination. | 
| 253 | Departure date/time from last port of call | 
|  | Date/time that conveyance departed from the last foreign port of call. | 
| 254 | Registration date of previous Customs declaration | 
|  | Registration date of the Customs declaration for the previous Customs procedure either in the same or another country. | 
| 255 | Availability due date | 
|  | Date when ordered items should be available at a specified location. | 
| 257 | Calculation date | 
|  | Self explanatory. | 
| 258 | Guarantee date (Customs) | 
|  | Date when guarantee is placed with Customs. | 
| 259 | Conveyance registration date | 
|  | Date when a vessel, vehicle or other means of transport was registered by a competent authority. | 
| 260 | Valuation date (Customs) | 
|  | Date when Customs valuation was made. | 
| 261 | Release date/time | 
|  | Date/time assigned to identify the release of a set of rules, conditions, conventions, productions, etc. | 
| 262 | Closure date/time/period | 
|  | Date/time/period when an enterprise is closed. | 
| 263 | Invoicing period | 
|  | Period for which an invoice is issued. | 
| 264 | Release frequency | 
|  | Frequency of a release. | 
| 265 | Due date | 
|  | Self explanatory. | 
| 266 | Validation date | 
|  | Self explanatory. | 
| 267 | Rate/price date/time | 
|  | Date/time on which a rate/price is determined. | 
| 268 | Transit time/limits | 
|  | Description to be provided. | 
| 270 | Ship during date | 
|  | The date identifying the period during or in which the goods should be shipped. | 
| 271 | Ship on or about date | 
|  | Date on or about which goods should be shipped. | 
| 272 | Documentary credit presentation period | 
|  | The specification of the period of time, expressed in number of days, after the date of issuance of the transport document(s) within which the documents must be presented. | 
| 273 | Validity period | 
|  | Dates (from/to)/period referenced documents are valid. | 
| 274 | From date of order receipt to sample ready | 
|  | Lead time is the defined timespan. | 
| 275 | From date of tooling authorization to sample ready | 
|  | Lead time is the defined timespan. | 
| 276 | From date of receipt of tooling aids to sample ready | 
|  | Lead time is the defined timespan. | 
| 277 | From date of sample approval to first product shipment | 
|  | Lead time is the defined timespan. | 
| 278 | From date of order receipt to shipment | 
|  | Lead time is the defined timespan. | 
| 279 | From date of order receipt to delivery | 
|  | Lead time is the defined timespan. | 
| 280 | From last booked order to delivery | 
|  | Lead time is the defined timespan. | 
| 281 | Date of order lead time | 
|  | Lead time is referenced to the date of order. | 
| 282 | Confirmation date lead time | 
|  | Lead time is referenced to the date of confirmation. | 
| 283 | Arrival date/time of transport lead time | 
|  | Lead time is referenced to the date a transport will arrive or has arrived. | 
| 284 | Before inventory is replenished based on stock check lead time | 
|  | Lead time is the defined timespan. | 
| 285 | Invitation to tender date/time | 
|  | Date/time on which the invitation to tender has been made available to relevant parties. | 
| 286 | Tender submission date/time | 
|  | Date/time on which the tender was submitted. | 
| 287 | Contract award date/time | 
|  | Date/time on which the contract is awarded to a tenderer. | 
| 288 | Price base date/time | 
|  | Base date/time of prices. | 
| 290 | Contractual start date/time | 
|  | Date/time on which activities stated in the contract must start. | 
| 291 | Start date/time, planned | 
|  | Self explanatory. | 
| 292 | Works completion date/time, planned | 
|  | Self explanatory. | 
| 293 | Works completion date/time, actual | 
|  | Self explanatory. | 
| 294 | Hand over date/time, planned | 
|  | Date/time on which hand over (i.e. the transfer of responsibility for an object or activity such as documentation, system etc. from one party to another) is planned to take place. | 
| 295 | Hand over date/time, actual | 
|  | Date/time on which hand over (i.e. the transfer of responsibility for an object or activity such as documentation, system etc. from one party to another) actually takes place. | 
| 296 | Retention release date/time | 
|  | Date/time on which the retention is released. | 
| 297 | Retention release date/time, partial | 
|  | Date/time on which the retention is partially released. | 
| 298 | Escalation start date | 
|  | Value date of the indexes appearing as denominators in an escalation formula. | 
| 299 | Price adjustment start date | 
|  | Value date of the indexes appearing as denominators in a price adjustment formula. | 
| 300 | Price adjustment limit date | 
|  | Limit value date of indexes used as numerators in a price adjustment formula. | 
| 301 | Value date of index | 
|  | Date of validity of index values. | 
| 302 | Publication date | 
|  | Self explanatory. | 
| 303 | Escalation date | 
|  | Value date of indexes appearing as numerators in an escalation formula. | 
| 304 | Price adjustment date | 
|  | Value date of indexes appearing as numerators in a price adjustment formula. | 
| 305 | Latest price adjustment date | 
|  | Date on which the latest price adjustment took place. | 
| 306 | Work period | 
|  | Period of execution of works. | 
| 307 | Payment instruction date/time | 
|  | Date/time on which a payment instruction was given. | 
| 308 | Payment valuation presentation date/time | 
|  | Date/time on which the payment valuation is presented. | 
| 309 | Blanks value date | 
|  | The date on which the funds are at the disposal of the receiving bank. | 
| 310 | Received date/time | 
|  | Date/time of receipt. | 
| 311 | On | 
|  | Fixed maturity day for deferred payment or time draft(s). | 
| 312 | Ship not before and not after date/time | 
|  | Shipment(s) of goods is/are to be made not before the first specified date/time and not after the second specified date/time. | 
| 313 | Order to proceed date | 
|  | Issue date of an instruction to start work. | 
| 314 | Planned duration of works | 
|  | Self explanatory. | 
| 315 | Agreement to pay date | 
|  | Date on which the debtor agreed to pay. | 
| 316 | Valuation date/time | 
|  | Date/time of valuation. | 
| 317 | Reply date | 
|  | Self explanatory. | 
| 318 | Request date | 
|  | Self explanatory. | 
| 319 | Customer value date | 
|  | Date at which funds are taken into account for interest calculation (in debit or credit). | 
| 320 | Declaration reference period | 
|  | Reference period of a set of items reported on the same declaration. | 
| 321 | Promotion date/period | 
|  | Date/period relevant for specific promotion activities. | 
| 322 | Accounting period | 
|  | Self-explanatory | 
| 323 | Horizon period | 
|  | Period forming a (planning) horizon. | 
| 324 | Processing date/period | 
|  | Date/period a specific process happened/will happen. | 
| 325 | Tax period | 
|  | Period a tax rate/tax amount etc. is applicable. | 
| 326 | Charge period | 
|  | Period a specified charge is valid for. | 
| 327 | Instalment payment due date | 
|  | Self-explanatory. | 
| 328 | Payroll deduction date/time | 
|  | Date/time of a monetary deduction made from the salary of a person on a payroll. | 
| 329 | Birth date/time | 
|  | Date/time when a person was born. | 
| 330 | Joined employer date | 
|  | Date when a person joins an employer. | 
| 331 | Contributions ceasing date/time | 
|  | Date/time when contributions cease. | 
| 332 | Contribution period end date/time | 
|  | Date/time when a contribution period ends. | 
| 333 | Part-time working change date/time | 
|  | Date/time when the proportion of part-time work changes. | 
| 334 | Status change date/time | 
|  | Date/time when a status changes. | 
| 335 | Contribution period start date/time | 
|  | Date/time when a contribution period commences. | 
| 336 | Salary change effective date | 
|  | Date when a change in salary becomes effective. | 
| 337 | Left employer date | 
|  | Date when a person leaves an employer. | 
| 338 | Benefit change date/time | 
|  | Date/time when a benefit provided by a service provider is changed. | 
| 339 | Category change date/time | 
|  | Date/time when a change of category is made. | 
| 340 | Joined fund date/time | 
|  | Date/time when a person joins a fund. | 
| 341 | Waiting time | 
|  | The period of time between the moment at which one wants an activity to begin and the moment at which this activity can actually begin. | 
| 342 | On-board date | 
|  | The date goods have been loaded on board of a conveyance. | 
| |   | 343 | 
 | Date/time of discount termination | 
|  | Date/time when the deduction from an amount comes to an end. | 
| |   | 344 | 
 | Date/time of interest due | 
|  | Date/time when the interest has to be paid. | 
| ZZZ | Mutually defined | 
|  | Self explanatory. |