Frames | No Frames

Return to EDIFACT D04B Code List page.

2017 -

Despatch pattern timing code
UN/CEFACT Revision 2004B Code List

Repr:an..3
Desc:Code specifying a set of dates/times within a despatch pattern.
This table also occurs in the following versions of this standard:
D00A, D00B, D01A, D01B, D01C, D02A, D02B, D03A, D03B, D04A, D04B, D93A, D94A, D94B, D95A, D95B, D96A, D96B, D97A, D97B, D98A, D98B, D99A, D99B

A1st shift (normal working hours)
The first working period as defined by an entity.
B2nd shift
A subsequent working period as defined by an entity, that follows 1st shift.
C3rd shift
A subsequent working period as defined by an entity, that follows 2nd shift.
DA.M.
Ante Meridiem (forenoon).
EP.M.
Post Meridiem (afternoon).
FAs directed
Shipment/delivery instruction will be provided in an independent communication session.
GAny shift
The production period that a product will be built such as 1st shift or 3rd shift.
H24 hour clock
Shipment/deliveries will be specified by a continuous time clock .
YNone
Used to cancel or override a previous pattern.
ZZZMutually defined
Despatch pattern timing according to agreement.

Change indicators
plus sign An addition.
asterisk Addition/substraction/change to a code entry for a particular data element.
hash or pound sign Changes to names.
vertical bar Changes to text for descriptions, notes and functions.
minus sign A deletion.
letter X Marked for deletion.

Usage indicators
Used in batch messages only.
Common usage in both batch and interactive messages.
Used in interactive messages only.

Return to EDIFACT D04B Code List page.