| Return to EDIFACT D01A Code List page. 
 
|  2017 -
 | 
Despatch pattern timing codeUN/CEFACT Revision 2001A Code List
 |   |  | Repr: | an..3 |  | Desc: | Code specifying a set of dates/times within a despatch pattern. |  
 |  | This table also occurs in the following versions of this standard: D00A, D00B, D01A, D01B, D01C, D02A, D02B, D03A, D03B, D04A, D04B, D93A, D94A, D94B, D95A, D95B, D96A, D96B, D97A, D97B, D98A, D98B, D99A, D99B
 |  
 
| |   | A | 
 | 1st shift (normal working hours) |  |  | The first working period as defined by an entity. |  | |   | B | 
 | 2nd shift |  |  | A subsequent working period as defined by an entity, that follows 1st shift. |  | |   | C | 
 | 3rd shift |  |  | A subsequent working period as defined by an entity, that follows 2nd shift. |  | D | A.M. |  |  | Ante Meridiem (forenoon). |  | E | P.M. |  |  | Post Meridiem (afternoon). |  | |   | F | 
 | As directed |  |  | Shipment/delivery instruction will be provided in an independent communication session. |  | G | Any shift |  |  | The production period that a product will be built such as 1st shift or 3rd shift. |  | |   | H | 
 | 24 hour clock |  |  | Shipment/deliveries will be specified by a continuous time clock . |  | Y | None |  |  | Used to cancel or override a previous pattern. |  | ZZZ | Mutually defined |  |  | Despatch pattern timing according to agreement. |  
 
			
				| Change indicators |  
				| plus sign |   | An addition. |  
				| asterisk |   | Addition/substraction/change to a code entry for a particular data element. |  
				| hash or pound sign |   | Changes to names. |  
				| vertical bar |   | Changes to text for descriptions, notes and functions. |  
				| minus sign |   | A deletion. |  
				| letter X |   | Marked for deletion. |  
 
			
				| Usage indicators |  
				|   | Used in batch messages only. |  
				|   | Common usage in both batch and interactive messages. |  
				|   | Used in interactive messages only. |  Return to EDIFACT D01A Code List page.
 |