4017 - |
Delivery plan commitment level code UN/CEFACT Revision 2001B Code List |
|
Repr: | an..3 |
Desc: | Code specifying the level of commitment to a delivery plan. |
| This table also occurs in the following versions of this standard:
D00A, D00B, D01A, D01B, D01C, D02A, D02B, D03A, D03B, D04A, D04B, D93A, D94A, D94B, D95A, D95B, D96A, D96B, D97A, D97B, D98A, D98B, D99A, D99B |
1 | Firm |
| Indicates that the scheduling information is a firm commitment. |
2 | Commitment for manufacturing and material |
| Authorizes the supplier to start the manufacturing of goods. |
3 | Commitment for material |
| Authorizes the manufacturer to order material required for manufacturing specified goods. |
4 | Planning/forecast |
| An estimate of future requirements based on trends and actual information. |
5 | Short delivered on previous delivery |
| Part of a consignment which was not delivered when the original delivery was made. |
6 | Capacity available |
| Capacity is available to meet the requested scheduling demands. |
9 | User defined |
| The user can interpret the meaning of the values from information exchanged previously. |
10 | Immediate |
| Indicates that the scheduling information is for immediate execution. |
11 | Pilot/Pre-volume |
| Initial products required in advance of the normal production process. |
12 | Planning |
| An estimate of future requirements. |
13 | Potential order increase |
| The possibility and magnitude of a schedule fluctuation. |
14 | Average plant usage |
| The usual amount that a manufacturing facility will use over a specified duration. |
15 | First time reported firm |
| Initial confirmation of a material requirement. |
16 | Maximum |
| The highest attainable amount. |
17 | Tooling capacity |
| The maximum amount that the process was designed to accommodate. |
18 | Normal tooling capacity |
| The anticipated amount that the process was designed to accommodate over a specific period of time. |
19 | Prototype |
| The preliminary version of a product or service. |
20 | Strike protection |
| Product level that is set aside as protection in the event of a work stoppage. |
21 | Required tooling capacity |
| The contracted amount that the process was designed to accommodate over a specific period of time. |
22 | Deliver to schedule |
| Deliver to schedule separately supplied. |
23 | Await manual pull |
| Await non-EDI instruction before shipping. |
24 | Reference to commercial agreement between partners |
| The buyer's commitment is the one defined in the commercial agreement. |
26 | Proposed |
| Indicates that the scheduling information is a proposal. |