Frames | No Frames

Return to EDIFACT D00B Code List page.

4017 -

Delivery plan commitment level code
UN/CEFACT Revision 2000B Code List

Repr:an..3
Desc:Code specifying the level of commitment to a delivery plan.
This table also occurs in the following versions of this standard:
D00A, D00B, D01A, D01B, D01C, D02A, D02B, D03A, D03B, D04A, D04B, D93A, D94A, D94B, D95A, D95B, D96A, D96B, D97A, D97B, D98A, D98B, D99A, D99B

1Firm
Indicates that the scheduling information is a firm commitment.
2Commitment for manufacturing and material
Authorizes the supplier to start the manufacturing of goods.
3Commitment for material
Authorizes the manufacturer to order material required for manufacturing specified goods.
4Planning/forecast
Self explanatory.
5Short delivered on previous delivery
Part of a consignment which was not delivered when the original delivery was made.
6Capacity available
Capacity is available to meet the requested scheduling demands.
9User defined
Self explanatory.
10Immediate
Indicates that the scheduling information is for immediate execution.
11Pilot/Pre-volume
Description to be provided.
12Planning
Description to be provided.
13Potential order increase
Description to be provided.
14Average plant usage
Description to be provided.
15First time reported firm
Description to be provided.
16Maximum
Description to be provided.
17Tooling capacity
Description to be provided.
18Normal tooling capacity
Description to be provided.
19Prototype
Description to be provided.
20Strike protection
Description to be provided.
21Required tooling capacity
Description to be provided.
22Deliver to schedule
Deliver to schedule separately supplied.
23Await manual pull
Await non-EDI instruction before shipping.
24Reference to commercial agreement between partners
The buyer's commitment is the one defined in the commercial agreement.
25
Reference to commercial agreement between partners
The buyer's commitment is the one defined in the commercial agreement. Note: 1. This code value will be removed effective with directory D.01A.
26Proposed
Indicates that the scheduling information is a proposal.

Change indicators
plus sign An addition.
asterisk Addition/substraction/change to a code entry for a particular data element.
hash or pound sign Changes to names.
vertical bar Changes to text for descriptions, notes and functions.
minus sign A deletion.
letter X Marked for deletion.

Usage indicators
Used in batch messages only.
Common usage in both batch and interactive messages.
Used in interactive messages only.

Return to EDIFACT D00B Code List page.