Frames | No Frames

Return to EDIFACT D97A Code List page.

9411 -

Government involvement, coded
UN/CEFACT Revision 1997A Code List

Repr:an..3
Desc:Indication of requirement and status of government involvement.
This table also occurs in the following versions of this standard:
D00A, D00B, D01A, D01B, D01C, D02A, D02B, D03A, D03B, D04A, D04B, D93A, D94A, D94B, D95A, D95B, D96A, D96B, D97A, D97B, D98A, D98B, D99A, D99B

1Carried out as instructed
Instructions have been carried out.
2Carried out as amended
Procedures have been carried out as amended.
3Completed
Procedures have been completed.
4Not applicable
Instructions are not applicable.
5Optimal
An action which is most desirable but not required.
6Required
Procedures are required.
7Applicable
Procedures are applicable.

Change indicators
plus sign An addition.
asterisk Addition/substraction/change to a code entry for a particular data element.
hash or pound sign Changes to names.
vertical bar Changes to text for descriptions, notes and functions.
minus sign A deletion.
letter X Marked for deletion.

Usage indicators
Used in batch messages only.
Common usage in both batch and interactive messages.
Used in interactive messages only.

Return to EDIFACT D97A Code List page.