6063 -

Quantity qualifier
UN/CEFACT Revision 1994B Code List

Repr:an..3
Desc:Code giving specific meaning to a quantity.
This table also occurs in the following versions of this standard:
D00A, D00B, D01A, D01B, D01C, D02A, D02B, D03A, D03B, D04A, D04B, D93A, D94A, D94B, D95A, D95B, D96A, D96B, D97A, D97B, D98A, D98B, D99A, D99B

1Discrete quantity
Self explanatory.
2Charge
Quantity relevant for charge.
3Cumulative quantity
Self explanatory.
11Split quantity
Part of the whole quantity.
12Despatch quantity
Quantity despatched by the seller.
17Quantity on hand
Self explanatory.
18Previous quantity
Quantity previously referenced.
20Unusable quantity
Self explanatory.
21Ordered quantity
The quantity which has been ordered.
22Quantity at 100%
Equivalent quantity at 100% purity.
23Active ingredient
Quantity at 100% active agent content.
31Estimated annual volume
Self explanatory.
32Minimum delivery batch
Self explanatory.
33Maximum delivery batch
Self explanatory.
35Price break from
The minimum quantity of a quantity range for a specified (unit) price.
36Price break to
Description to be provided.
40Normal delivery
Quantity normally delivered by the seller.
46Pieces delivered
Number of pieces actually received at the final destination.
47Invoiced quantity
The quantity as per invoice.
48Received quantity
The quantity which has been received.
49Chargeable distance
Distance really charged by tariff appliance.
52Quantity per pack
Self explanatory.
53Minimum order quantity
Self explanatory.
54Maximum order quantity
Self explanatory.
59Numbers of consumer units in the traded unit
Self explanatory.
61Return quantity
Self explanatory.
62Sorted quantity
Description to be provided.
63Sorted quantity rejected
Description to be provided.
64Scrap quantity
Remainder of the total quantity after split deliveries.
65Destroyed quantity
Self explanatory.
66Committed quantity
Quantity a party is committed to.
70Cumulative quantity received
Cumulative quantity of all deliveries of this article received by the buyer.
71Cumulative quantity ordered
Cumulative quantity of all deliveries, outstanding and scheduled orders.
72Cumulative quantity received end of prior year
Cumulative quantity of all deliveries of the product received by the buyer till end of prior year.
73Outstanding quantity
Difference between quantity ordered and quantity received.
74Latest cumulative quantity
Cumulative quantity after complete delivery of all scheduled quantities of the product.
75Previous highest cumulative quantity
Cumulative quantity after complete delivery of all scheduled quantities of the product from a prior schedule period.
77Work days
Number of work days, e.g. per respective period.
78Cumulative quantity scheduled
Adding the quantity actually scheduled to previous cumulative quantity.
79Previous cumulative quantity
Cumulative quantity prior the actual order.
81Extra unplanned delivery
Non scheduled additional quantity.
82Quantity requirement for sample inspection
Self explanatory.
83Backorder quantity
Self explanatory.
84Urgent delivery quantity
Self explanatory.
85Previous order quantity to be cancelled
Self explanatory.
90As is quantity
Self explanatory.
91Open quantity
Quantity remaining after partial delivery.
92Final delivery quantity
Quantity of final delivery to a respective order.
93Subsequent delivery quantity
Quantity delivered to a respective order after it's final delivery.
94Substitutional quantity
Quantity delivered replacing previous deliveries.
95Redelivery after post processing
Self explanatory.
99Estimated quantity
Self explanatory.
100Chargeable weight
The weight on which charges are based.
101Chargeable gross weight
The gross weight on which charges are based.
102Chargeable tare weight
The tare weight on which charges are based.
103Chargeable number of axles
The number of axles on which charges are based.
104Chargeable number of containers
The number of containers on which charges are based.
105Chargeable number of rail wagons
The number of rail wagons on which charges are based.
106Chargeable number of packages
The number of packages on which charges are based.
107Chargeable number of units
The number of units on which charges are based.
108Chargeable period
The period of time on which charges are based.
109Chargeable volume
The volume on which charges are based.
110Chargeable cubic measurements
The cubic measurements on which charges are based.
111Chargeable surface
The surface area on which charges are based.
112Chargeable length
The length on which charges are based.
113Quantity to be delivered
The quantity to be delivered.
114Number of passengers
Total number of passengers on the conveyance.
115Number of crew
Total number of crew members on the conveyance.
116Number of transport documents
Total number of air waybills, bills of lading, etc. being reported for a specific conveyance.
117Quantity landed
Quantity of goods actually arrived.
118Quantity manifested
Quantity of goods contracted for delivery by the carrier.
119Short shipped
Indication that part of the consignment was not shipped.
120Split shipment
Indication that the consignment has been split into two or more shipments.
121Over shipped
Indication that more goods have been shipped than contracted for delivery.
122Short-landed goods
If quantity of goods actually landed is less than the quantity which appears in the documentation. This quantity is the difference between these quantities.
123Surplus goods
If quantity of goods actually landed is more than the quantity which appears in the documentation. This quantity is the difference between these quantities.
124Damaged goods
Quantity of goods which have deteriorated in transport such that they cannot be used for the purpose for which they were originally intended.
125Pilferage goods
Quantity of goods stolen during transport.
126Lost goods
Quantity of goods that disappeared in transport.
127Report difference
The quantity concerning the same transaction differs between two documents/messages and the source of this difference is a typing error.
128Quantity loaded
Quantity of goods loaded onto a means of transport.
129Units per unit price
Number of units per unit price.
130Allowance
Quantity relevant for allowance.
131Delivery quantity
Quantity required by buyer to be delivered.
132Cumulative quantity, preceding period, planned
Cumulative quantity originally planned for the preceding period.
133Cumulative quantity, preceding period, reached
Cumulative quantity reached in the preceding period.
134Cumulative quantity, actual planned
Cumulative quantity planned for now.
135Period quantity, planned
Quantity planned for this period.
136Period quantity, reached
Quantity reached during this period.
137Cumulative quantity, preceding period, estimated
Estimated cumulative quantity reached in the preceding period.
138Cumulative quantity, actual estimated
Estimated cumulative quantity reached now.
139Cumulative quantity, preceding period, measured
Surveyed cumulative quantity reached in the preceding period.
140Cumulative quantity, actual measured
Surveyed cumulative quantity reached now.
141Period quantity, measured
Surveyed quantity reached during this period.
142Total quantity, planned
Total quantity planned.
143Quantity, remaining
Quantity remaining.
144Tolerance
Plus or minus tolerance expressed as a monetary amount.
145Actual stock
The stock on hand, undamaged, and available for despatch, sale or use.
146Model or target stock
The stock quantity required or planned to have on hand, undamaged and available for use.
147Direct shipment quantity
Quantity to be shipped directly to a customer from a manufacturing site.
148Amortization total quantity
Indication of final quantity for amortization.
149Amortization order quantity
Indication of actual share of the order quantity for amortization.
150Amortization cumulated quantity
Indication of actual cumulated quantity of previous and actual amortization order quantity.
151Quantity advised
Quantity advised by supplier or shipper, in contrast to quantity actually received.
152Quantity on hand
The total quantity of a product on hand at a location. This includes as well units awaiting return to manufacturer, units unavailable due to inspection procedures and undamaged stock available for despatch, resale or use.
153Statistical sales quantity
Quantity of goods sold in a specified period.
154Sales quantity planned
Quantity of goods required to meet future demands. -Market intelligence quantity.
155Replenishment quantity
Quantity required to maintain the requisite on-hand stock of goods.
156
Inventory movement quantity
To specify the quantity of an inventory movement.
157Opening stock balance quantity
To specify the quantity of an opening stock balance.
158Closing stock balance quantity
To specify the quantity of a closing stock balance.
159
Number of stops
Number of times a means of transport stops before arriving at destination.
160
Minimum production batch
The quantity specified is the minimum output from a single production run.
161
Dimensional sample quantity
The quantity defined is a sample for the purpose of validating dimensions.
162
Functional sample quantity
The quantity defined is a sample for the purpose of validating function and performance.
163
Pre-production quantity
Quantity of the referenced item required prior to full production.
164
Delivery batch
Quantity of the referenced item which constitutes a standard batch for deliver purposes.
165
Delivery batch multiple
The multiples in which delivery batches can be supplied.
166
All time buy
The total quantity of the referenced covering all future needs. Further orders of the referenced item are not expected.
167
Total delivery quantity
The total quantity required by the buyer to be delivered.
168
Single delivery quantity
The quantity required by the buyer to be delivered in a single shipment.
169
Supplied quantity
Quantity of the referenced item actually shipped.
170
Allocated quantity
Quantity of the referenced item allocated from available stock for delivery.
171
Maximum stackability
The number of pallets/handling units which can be safely stacked one on top of another.
172
Amortisation quantity
The quantity of the referenced item which has a cost for tooling amortisation included in the item price.
173
Previously amortised quantity
The cumulative quantity of the referenced item which had a cost for tooling amortisation included in the item price.
174
Total amortisation quantity
The total quantity of the referenced item which has a cost for tooling amortisation included in the item price.
175
Number of moulds
The number of pressing moulds contained within a single piece of the referenced tooling.
176
Concurrent item output of tooling
The number of related items which can be produced simultaneously with a single piece of the referenced tooling.
177
Periodic capacity of tooling
Maximum production output of the referenced tool over a period of time.
178
Lifetime capacity of tooling
Maximum production output of the referenced tool over its productive lifetime.
179
Number of deliveries per despatch period
The number of deliveries normally expected to be despatched within each despatch period.
180
Provided quantity
The quantity of a referenced component supplied by the buyer for manufacturing of an ordered item.
181
Maximum production batch
The quantity specified is the maximum output from a single production run.
182
Cancelled quantity
Quantity of the referenced item which has previously been ordered and is now cancelled.
183
No delivery requirement in this instruction
This delivery instruction does not contain any delivery requirements.
184
Quantity of material in ordered time
Quantity of the referenced material within the ordered time.
185
Rejected quantity
The quantity of received goods rejected for quantity reasons.
186
Cumulative quantity scheduled up to accumulation start date
The cumulative quantity scheduled up to the accumulation start date.
187
Quantity scheduled
The quantity scheduled for delivery.
188
Number of identical handling units
Number of identical handling units in terms of type and contents.
189
Number of packages in handling unit
The number of packages contained in one handling unit.
190
Despatch note quantity
The item quantity specified on the despatch note.

Change indicators
plus sign An addition.
asterisk Addition/substraction/change to a code entry for a particular data element.
hash or pound sign Changes to names.
vertical bar Changes to text for descriptions, notes and functions.
minus sign A deletion.
letter X Marked for deletion.

Return to EDIFACT D94B Code List page.