Frames | No Frames

Return to EDIFACT D02A Segments page.

POP -

Period of operation
UN/CEFACT Revision 2002A Segment List

Function:To specify date or time period with days of operation.
This segment also occurs in the following versions of this standard:
D00A, D00B, D01A, D01B, D01C, D02A, D02B, D03A, D03B, D04A, D04B

Pos Segment M/C Repeat Repr. Notes
010 E013 DATE AND TIME INFORMATION M 1
2005 Date or time or period function code qualifier M an..3
2380 Date or time or period text M an..35
2379 Date or time or period format code C an..3
4440 Free text C an..512
020 2160 Days of week set identifier C 1 an..7
030 4405 Status description code C 1 an..3

PosPosition
M/CMandatory or Conditional
Repr.Representation (Data or Content Type)

Segment POP is used in the following messages:
SKDREQSKDUPDTSDUPD

Change indicators
plus sign An addition.
asterisk Addition/substraction/change to a code entry for a particular data element.
hash or pound sign Changes to names.
vertical bar Changes to text for descriptions, notes and functions.
minus sign A deletion.
letter X Marked for deletion.

Return to EDIFACT D02A Segments page.